Contemporary attached-home entry with cedar cladding, pale stucco, charcoal window frames and a mature walnut tree beside the concrete approach.

Danville Townhomes for Sale: What The Orchard's Prices Mean

A buyer who signs this fall for the $955,000 townhome at 156 Tulare Court in Danville is signing for a house that isn't finished. The builder lists it as available in February 2027, so the buyer's rate, appraisal and closing all fall months after the contract. That delay is the first piece of friction in what has become Danville's lowest-priced way into a new home. It also explains why one development matters so much more here than it would in Dublin or San Ramon.

Danville's detached market gets most of the attention. In August 2026 the median single-family sale for Danville and Blackhawk was $2,043,000, from 46 sales. The attached market below it is tiny. Trumark Homes' The Orchard is adding 124 townhome-style condominiums to it, priced from $955,000 to $1,119,000 on the builder's current inventory page. A market that small doesn't absorb new supply quietly. The new supply ends up setting the price.

A year of resales, arriving from one builder

Here is Danville's condo and townhome market by month, from Bay East's Danville attached report for August 2026:

Month Sold Median sale price
Feb 2026 10 $1,000,000
Mar 2026 5 $800,000
Apr 2026 13 $1,160,000
May 2026 10 $1,110,000
Jun 2026 12 $1,080,000
Jul 2026 14 $1,120,000
Aug 2026 11 $1,140,000

From September 2025 through August 2026, the same report counts about 120 attached sales in total. December 2025 and January 2026 had five each. The Orchard's 124 homes come to roughly a full year of the town's condo and townhome resales, all from one seller on one site.

Thin volume also explains why the median jumps around. Over those 12 months, the monthly attached median ranged from $700,000 in December 2025 to $1,160,000 in April 2026. A few sales can move the number by hundreds of thousands of dollars, so it tells you more about which units happened to close that month than about value. In August 2026 there were 30 active attached listings, about 2.4 months of supply, selling in an average of 23 days at 99% of list price.

Now compare The Orchard's pricing. The 1,503-square-foot two-bedroom at 156 Tulare Court works out to about $635 a square foot at $955,000. Danville's attached resales averaged $613 a square foot sold in August 2026, $830 in July and $680 in June. Active listings averaged $786 a square foot in August. A brand-new townhome is listed close to what older resales actually sell for, and well under what resale sellers are asking.

That matters to both sides of the market. A buyer comparing an older Danville condo with an Orchard home is comparing it with a new unit at a similar price per square foot, with a delivery date attached. A resale owner listing a two-bedroom over the next year will be competing with a builder that has plenty of inventory and a closing-cost incentive.

Why there is new supply at this price at all

Danville rarely gets 124 new homes in one place. This site came open through a long chain of events. The Town identifies the project as 3020 Fostoria Way, on the northern part of the former Borel property and the last piece of a walnut orchard. DanvilleSanRamon.com reported in 2021 that the Borel family had worked the orchard since 1945. When Armand Borel died in 2009, he left the remaining property to the East Bay Regional Park District for an agricultural-history park. The district took title in 2019 after years of litigation and reached an agreement of intent with Trumark in 2020.

In spring 2024 the park district transferred 7.28 acres of the original 17-acre property to Trumark for $32 million. The proceeds were to go toward trust debts, including $9.5 million plus interest owed to the district, and to pay for a park on the remaining land. Local reporting puts that remaining park land at about 10 acres. Trumark's page describes the homes as next to about 17 acres of preserved agricultural parkland. If open space next door affects what you're willing to pay, ask the sales office for the park district's current site plan.

The Planning Commission approved the plan 6–1 on January 23, 2024: 124 for-sale townhomes plus 43 below-market rental apartments for low- and very-low-income households, with a 55-year affordability term. Under SB 330 that vote was the Town's final approval unless someone appealed. In February 2025 the Town Council approved up to $30 million in tax-exempt bonds for the rental building and stated that Danville would carry no liability for them. The Town's June 2026 update lists that rental component as 44 units. It also notes an application for two more eight-unit buildings under Building Division review. If those buildings are approved, more units will be added to the same thin market.

The church site shows the pipeline isn't a one-off

The Orchard could be read as a one-time result of an estate, a park district and a lawsuit. The next project points to something lasting. At 222 West El Pintado, the CPC Legacy proposal calls for 49 townhouses and 19 attached ADUs on a roughly 12-acre church campus and would demolish 21 existing homes. It uses the State Density Bonus Law, and four of the ADUs would be restricted to very-low-income households if they are rented.

The July 21, 2026 Town Council staff report states the limits plainly. The Town may not apply subjective architectural design criteria. It must grant waivers from objective standards such as story count, height and floor area ratio when a project needs them. The project is also statutorily exempt from CEQA under AB 130. The Council denied the appeal that night and upheld the Planning Commission's approval. According to the Town's project log, the Design Review Board reviewed the final siting, architecture, materials, landscape screening and lighting on September 24, 2026, and gave direction. The log doesn't list a construction start or sales date yet.

Put the two projects together and the pattern is clear. State law now gives qualifying townhome projects on large private parcels a much more direct path through Danville's approval process. For an entry-level buyer, that means the under-$1.2 million options in this town are increasingly new attached homes on church and orchard land, delivered in phases. Your timing depends on the builder's schedule, not just on what's listed that week.

What the price sheet leaves out

Once one builder sets the entry price, the details that move your monthly payment matter more than the list price. Here is what to settle before you sign at The Orchard or any presale like it.

  1. Delivery date versus your rate lock. The earliest homes on Trumark's page are listed as available February 2027. The Town's June 2026 update said the first townhomes under construction were the models. A contract signed in October has a long gap before funding. Decide early whether to pay for a longer lock or float, and get the cost of each option in writing.
  2. HOA dues. None of the builder pages we reviewed lists a monthly HOA amount. For a condominium, that number feeds straight into your debt-to-income ratio, so get it before you commit to a price.
  3. Danville's lighting and landscaping assessment. The Town's Landscaping and Lighting Assessment District shows up on the property tax bill, and condos are rated at 0.75 of a single-family unit. Based on the FY 2025/26 maximum rates, that works out to roughly $165 to $247 a year for a condo. The actual zone and the FY 2026/27 amount still need to be confirmed for the specific parcel.
  4. Special taxes. We couldn't find a public document confirming whether The Orchard is inside a community facilities district. Ask for the full tax disclosure so your lender can run the real number instead of a rough estimate.
  5. The lender incentive. Trumark's prequalification page offers a closing-cost credit to buyers who use its affiliated lender, Icon Lending. It doesn't state an amount, and it says buyers aren't required to use that lender. Compare the credit with the rate and fees from at least one outside quote, because a credit and a lower rate add up very differently over the life of the loan.
  6. The appraisal. With 11 attached sales in Danville in August 2026, comparable sales are scarce. As The Orchard's own homes close, they may become a large share of the comps an appraiser has to work with.

Questions buyers are asking

Is The Orchard selling quickly? No public source gives a sales count. Trumark announced in May 2026 that presales and model openings were planned for summer 2026. The June 4, 2026 report in DanvilleSanRamon.com covered the launch but gave no sales-pace figures.

Are the below-market rentals part of the for-sale pricing? No. The 43 rental apartments were approved as a separate component alongside the 124 for-sale townhomes. They are not a discount on Orchard purchases.

Does the Danville detached median apply here? Not directly. Bay East's detached figure of $2,043,000 for August 2026 combines Danville and Blackhawk, and it tracks a different kind of property from three-story condominiums. The attached report is the right comparison.

If you're weighing an Orchard contract against a Danville resale, Glen Dsouza can model both side by side. That includes the lock cost to a February 2027 closing, the HOA and assessment lines once they're disclosed, and the builder's lender credit against an outside quote. Schedule a free consultation and bring the builder's price sheet.

This article is general information, not legal, tax or financial advice. Consult a qualified professional about your situation.

Let’s Find Your Dream Home

Get assistance in determining current property value, crafting a competitive offer, writing and negotiating a contract, and much more. Contact me today.

Follow Me on Instagram